

Loading
FORTA-FI® - Dense Graded HMA
FORTA-FI helped to extend the life of a busy state highway by reducing reflective and alligator cracking.
FORTA-FI® - Dense Graded HMA
A side by side trial in Pine Township, PA comparing FORTA-FI reinforced asphalt to a traditional mix design.
FORTA-FI® - Dense Graded HMA
District 12 in Mount Holly, NC was in need of an overlay for a busy street that succumbed to reflective and alligator cracking.
FORTA-FI® - SMA
Help to extend the service life of the Autobahn A9 highway with FORTA-FI by increasing the durability of the SMA mix that tends to ravel quickly.
FORTA-FI® - Dense Graded HMA
Love’s Travel Stop, a newly constructed rest stop, used FORTA-FI to reinforce a large parking lot that could perform well under heavy truck traffic.
- PFC
Wee Burn Country Club, located in Darien, Connecticut, used FORTA-FI in combination with a porous asphalt pavement in their new 1-acre parking lot.
FORTA-FI® - Dense Graded HMA
The Gainesville Airport’s runway taxi-lane was in need of serious reconstruction using FORTA-FI as the trusted reinforcement method.
FORTA-FI® - Dense Graded HMA
The city’s road specialists chose to incorporate FORTA-FI - in the two 1-1/2” overlays - to prevent future reflective cracking for two roadways in Florida.
FORTA-FI® - Dense Graded HMA
Alabama Avenue Square project consisted of a 1/2 mile long South Alabama Avenue road overlay in order to accurately test the success of FORTA-FI vs. untreated asphalt.
- Dense Graded HMA
FORTA-FI was used in a 3” wearing course on a corporate parking lot and access road at the Boeing facility in Mesa, AZ.
FORTA-FI® - Dense Graded HMA
1300-1868 W. Avenue D suffered severe alligator cracking from years of heavy truck traffic so LA County engineers wanted to explore FORTA-FI as an alternative reinforcement method.
FIBER EXPERTS ON STAFF
Ready to Answer Questions
& Aid in Technical Support