Description
Reinforcement with FORTA-FI® was used in this 2” overlay with edge milling to help delay reflective cracking and maximize the useable life of this roadway surface. This is the second project at Sky Harbor to utilize FORTA-FI® after successful results were achieved on the G2 Flyover Bridge.
Key Points
- Extended Pavement Life
- Reduced Rutting & Raveling
- Reduced Cracking