Description
FORTA-FI was used in approximately half of this light commercial parking lot in the spring of 1988. According to the project laydown contractor, there was a noticeable compaction advantage to the sections containing the fiber reinforcement. The FORTA-FI was used at a dosage of 1.0 lb/ton in the 1-1/2 in to 2 in topping layer in the front parking lot on Milltown Road in Wooster, OH.
Key Points
- Extended Pavement Life
- Reduced Maintenance Costs
- Reduced Cracking