Charlotte City Streets – Charlotte, NC

2020 - Charlotte, NC

Project Description

Charlotte City Streets received a 2″ mill & fill in this resurfacing project. This high-volume roadway utilized a Dense Grade HMA with a 30% fractioned Reclaimed Asphalt Pavement (RAP). North Carolina Department of Transportation (NCDOT) incorporated FORTA-FI reinforcement fibers to increase the pavement’s life cycle—by reducing cracking, rutting, and raveling.

Key Points

  • Reduce Raveling
  • Reduce Rutting
  • Increase Life Cycle

Download PDF

Calculate Your Savings!
Select Unit:US TonMetric Ton
Enter Asphalt:

Enter Asphalt Price:
FORTAfied asphalt for Tons of Savings!

Use our Savings Calculator to compare material costs between a traditional asphalt mixture and FORTAfied Asphalt.

Original Asphalt Cost:

Reduction in Asphalt Thickness:

Reduced Asphalt Cost:
Cost of FORTA-FI (based on MSRP):

FORTAfied Asphalt Cost =

Material Cost Savings =
Savings in Tons =