Project Description
FORTA-FI was used in a 1 1/2” base and 2” wearing courses of a new office parking lot for FORTA Corporation. It was also used only for a 4” ID3 base on a heavily used truck loading dock area. FORTA-FI helped to reduce alligator and reflective cracking as well as extend the overall pavement life.
Update
In 2017, 7 years after the initial construction, the parking lot was surveyed and had performed extremely well regarding crack control, especially while under heavy loads from large tractor-trailers.
Key Points
- Extend Pavement Life
- Reduced Rutting
- Reduced Cracking