Marvin Road Improvements

Lacey, WA - 2016

Project Description

An existing roundabout and access roads had extensive fatigue cracking due to heavy warehouse truck traffic. FORTA-FI® was used for a 2” inlay to extend design life and reduce fatigue cracking. It was also used in a new 8” thick line approaching the roundabout to increase design life and reduce maintenance costs. The use of the Voyager allowed the operator to easily program the fiber feed rate to match the plant’s asphalt production rate. Plant workers also commented on the easy set up for the Voyager and its extreme accuracy.

Key Points

  • Extended Life
  • Reduced Cracking
  • Voyager Used to Feed Fiber

Download PDF

Calculate Your Savings!
Select Unit:US TonMetric Ton
Enter Asphalt:

Enter Asphalt Price:
FORTAfied asphalt for Tons of Savings!

Use our Savings Calculator to compare material costs between a traditional asphalt mixture and FORTAfied Asphalt.

Original Asphalt Cost:

Reduction in Asphalt Thickness:

Reduced Asphalt Cost:
Cost of FORTA-FI (based on MSRP):

FORTAfied Asphalt Cost =

Material Cost Savings =
Savings in Tons =