ODOT Trial Project – Ohio

Ohio - 2021

Project Description

The Ohio Department of Transportation (ODOT) used FORTA-FI reinforcement fibers in this high-volume trial roadway project. We will monitor this pavement in FORTA’s commitment to create Stronger Lasting™ pavements.

Technical Specifications

  • Fiber Reinforcement: FORTA-FI®
  • Total project Size: 6,000 Tons
  • Construction Type: Composite Overlay
  • Mix Design: 12.55 mm SuperPave with PG 70-22 Binder

Download PDF

Calculate Your Savings!
Select Unit:US TonMetric Ton
Enter Asphalt:

Enter Asphalt Price:
FORTAfied asphalt for Tons of Savings!

Use our Savings Calculator to compare material costs between a traditional asphalt mixture and FORTAfied Asphalt.

Original Asphalt Cost:

Reduction in Asphalt Thickness:

Reduced Asphalt Cost:
Cost of FORTA-FI (based on MSRP):

FORTAfied Asphalt Cost =

Material Cost Savings =
Savings in Tons =