SR 13

Mansfield, OH - 2011

Description

The Ohio Department of Transportation used FORTA-FI® to reinforce portions of the State Route-13 repaving project south of Mansfield, Ohio. This high-traffic roadway connects to lnterstate-71, with high-use entrance and exit ramps and a well-traveled business access intersection at Hanley Road. ODOT selected FORTA-FI® for use in various sections of this asphalt material trial project. A traditional Superpave asphalt mix design was used for the entire project, with FORTA-FI® added to the fiber-reinforced portions of the roadway where specified. 

Key Points

  • Extended Pavement Life
  • Reduced Rutting & Raveling
  • Reduced Cracking

Download PDF

Calculate Your Savings!
Select Unit:US TonMetric Ton
Enter Asphalt:

Enter Asphalt Price:
FORTAfied asphalt for Tons of Savings!

Use our Savings Calculator to compare material costs between a traditional asphalt mixture and FORTAfied Asphalt.

Original Asphalt Cost:

Reduction in Asphalt Thickness:

Reduced Asphalt Cost:
Cost of FORTA-FI (based on MSRP):

FORTAfied Asphalt Cost =

Material Cost Savings =
Savings in Tons =