This Tyburn Road project was full depth replacement of existing composite pavement which carries ADT of 18,799 with 5-27% truck traffic. The base course used consisted of PG 64-22, 25mm, 6” depth, HMA, 30 million ESAL SUPERPAVE mix, with PG76-22, 19mm, 3” depth HMA intermediate course, 30 million ESAL SUPERPAVE mix. The wearing course, placed in the summer of 2014, utilizes a PG76- 22, 2” Depth, 9.5mm, SRL E, 30+ ESAL SUPERPAVE mix. This section of road services a landfill and multimodal facility with considerable truck traffic.

Update

After 10 years, this high-volume roadway looks great with minimal cracking. Over the years very little crack seal was used throughout. The fiber side of the road held up noticeably better than the
control side, especially in control sections consisting of large potholes.

Technical Specifications

  • Fiber Reinforcement: FORTA-FI®
  • Tonnage: 43,000
  • Thickness: 11″
  • Existing Distresses: High Volume Roadway

Download PDF

Calculate Your Savings!
Select Unit:US TonMetric Ton
Enter Asphalt:

Enter Asphalt Price:
FORTAfied asphalt for Tons of Savings!

Use our Savings Calculator to compare material costs between a traditional asphalt mixture and FORTAfied Asphalt.

Original Asphalt Cost:

Reduction in Asphalt Thickness:

Reduced Asphalt Cost:
Cost of FORTA-FI (based on MSRP):

FORTAfied Asphalt Cost =

Material Cost Savings =
Savings in Tons =