Trumbull Roads – Trumbull, CT

Trumbull, CT - September 2022

Description

The town of Trumbull completed a side-by-side project using FORTA-FI reinforcement fibers. Contractors milled 2” and replaced with a 0.75” leveling course and 1.5” compacted wear course using a wedge joint. The wear course used fiber reinforcement in the east bound lanes on both roads. The leveling course also benefitted from the use of fiber as noted.

Plant Evaluations and Fiber Test Results available upon request.

Technical Specifications

  • Fiber Reinforcement: FORTA-FI
  • Total Project Size: 3,000 Tons
  • Overlay Thickness: 0.75” – 1.5”
  • Addition Method: Voyager Fiber Feeder
  • Additives: 15% RAP

Download PDF

Calculate Your Savings!
Select Unit:US TonMetric Ton
Enter Asphalt:

Enter Asphalt Price:
FORTAfied asphalt for Tons of Savings!

Use our Savings Calculator to compare material costs between a traditional asphalt mixture and FORTAfied Asphalt.

Original Asphalt Cost:

Reduction in Asphalt Thickness:

Reduced Asphalt Cost:
Cost of FORTA-FI (based on MSRP):

FORTAfied Asphalt Cost =

Material Cost Savings =
Savings in Tons =