Ward Street

Fountain Valley, CA - 2014

Description

The repair of Ward Street involved full depth removals in localized areas and a 2” FORTA-FI® reinforced ARHM cap. During the design phase of the project, alternative structural sections incorporating Mechanically Stabilized Aggregate and Fiber Reinforced Asphalt were evaluated for the full depth removal areas. FORTA-FI® was added to reduce thickness for immediate cost savings. In addition, FORTA-FI® reinforcement was added to the ARHM cap for longevity.

Key Points

  • Extended Pavement Life
  • Reduced Rutting & Raveling
  • Reduced Cracking

Download PDF

Calculate Your Savings!
Select Unit:US TonMetric Ton
Enter Asphalt:

Enter Asphalt Price:
FORTAfied asphalt for Tons of Savings!

Use our Savings Calculator to compare material costs between a traditional asphalt mixture and FORTAfied Asphalt.

Original Asphalt Cost:

Reduction in Asphalt Thickness:

Reduced Asphalt Cost:
Cost of FORTA-FI (based on MSRP):

FORTAfied Asphalt Cost =

Material Cost Savings =
Savings in Tons =