Project Description
The main drive of this property was reinforced from the main entrance to the gate and continued into the receiving area. In the first phase of this project contractors milled to full-depth and replaced with binder and wear surface lifts. The entirety of this project was done at night, with low 40 temperatures, there were no issues with mixing or placing of the asphalt.
Technical Specifications
- Fiber Reinforcement: FORTA-FI®
- Application: Full-Depth Reclamation
- Reinforced Layers: Base & Wearing
- Mix Formula: Dense Grade HMA
- Delivery Method: RAP Belt