State Route 519 – Morehead, KY

Morehead, KY - October 2018

Project Description

The Kentucky Department of Transportation (KYDOT) began a control vs fiber test on State Route 519, off US 60, on Baldridge Road using Surface-EXT. The road was applied at a dosage of 23 lb/ sq yd with .2% Surface-EXT and applied at a thickness of approximately 1/4” to 3/8”. Before the application, the road was crack sealed and previously had two different applications applied to it before the micro surfacing began. Both sides of the road were having problems with cracking and raveling and similar in common distresses.

KYDOT chose this new product trial using Surface-EXT to increase the road’s longevity while reducing the reflective cracking that keeps occurring. Reduced project costs were also important to them. For little cost added to the project, they will add years of life with micro surfacing resulting in a high return on investment.

Update

2 years after utilizing Surface-EXT in this micro surfacing application, the control side has significant cracks that have doubled while the Surface-EXT side have only increased by 30%. If this cracking trend continues, the moisture intrusion damage will be evident in the next few years.

Key Points

  • Increase Longevity
  • Reduce Project Cost
  • Reduced Cracking

Download PDF

Calculate Your Savings!
Select Unit:US TonMetric Ton
Enter Asphalt:

Enter Asphalt Price:
FORTAfied asphalt for Tons of Savings!

Use our Savings Calculator to compare material costs between a traditional asphalt mixture and FORTAfied Asphalt.

Original Asphalt Cost:

Reduction in Asphalt Thickness:

Reduced Asphalt Cost:
Cost of FORTA-FI (based on MSRP):

FORTAfied Asphalt Cost =

Material Cost Savings =
Savings in Tons =