State Route 63 – Rochester, NY

Rochester, NY - 2016

Description

11 miles of State Route 63 in NY DOT Division 4 was in need of resurfacing. Standard repairs of a concrete pavement would have included deep joint repairs and cost the taxpayers over $600,000. District 4 decided to add FORTA-FI reinforcement fibers to the 2” composite overlay.

Update

After 5 years of heavy volume traffic this project has been inspected and remains in excellent condition.

Technical Specifications

  • Reinforcement Fiber: FORTA-FI®
  • Application: Mill & Fill
  • Existing Pavement: Composite Roadway
  • Overlay Thickness: 2” HMA
  • Traffic Volume: 20% Heavy Truck Load

Download PDF

Calculate Your Savings!
Select Unit:US TonMetric Ton
Enter Asphalt:

Enter Asphalt Price:
FORTAfied asphalt for Tons of Savings!

Use our Savings Calculator to compare material costs between a traditional asphalt mixture and FORTAfied Asphalt.

Original Asphalt Cost:

Reduction in Asphalt Thickness:

Reduced Asphalt Cost:
Cost of FORTA-FI (based on MSRP):

FORTAfied Asphalt Cost =

Material Cost Savings =
Savings in Tons =